Enquire Now

All fields are mandatory.
Back

Presenting "GREEN HEIGHTS", spread over more than 2.75 acres well planned mega residential complex, the next dream home for today's Kolkata with luxurious 436 apartments consisting 2BHK, 3BHK, 4BHK options. The Green Heights - Raigachi optimizes more than 65% open area space to ensure maximum level of comfort and luxury to the resident. The project will be having four blocks of G+12 building and two blocks of G+4 building. The project has been designed in such a fashion so that light, air cross-ventilation and security will not be a matter of concern.

The objective behind giving shape to Green Heights, is to provide the heights of premium living one can aspire for, near City Center II - in the heart of the upscale and much coveted Rajarhat area of Kolkata, which gives you an opportunity to emancipate yourself. In Green Heights, we provide all the latest Ultra-Modern lifestyle facilities and amenities to suit your choice of state-of-the -art living standard. Green Heights is an ensemble of luxurious life style, which fulfills all your expectations from the dream home you have been searching for you and your family.

Highlights :

  • 250 mtrs from the proposed six lane expressway
  • 2.5+ Acres well-planned Mega Residential Complex
  • 436 Apartments
  • More than 65% open area with Ultramodern Amenities
  • Four blocks in Phase-I (all of G+12) and two blocks in Phase-II (all of G+4)
  • 15,000 + Sq.Ft. dedicated G + 3 Storied Club Building
  • Grand Entrance Gate to enter the Complex
    • State-of-the-art fire fighting system.
    • Intercom network.
    • Cable TV and Broadband.
    • Visitors car parking area.
    • Sewage treatment plant.
    • Rain water harvesting system.
    • 24 hour's Power backup. Water filtration plant.
    • 24 hour's water supply.
    • 2/4 hours High speed fully automatic elevators in each block.
    • Children's play area.
    • 24 hours security with CCTV for the compound wall.
    • Extra cost for Flats

 

Club Amenities :

  • Decorated Club Lounge
  • Indoor Swimming Pool & Baby Pool
  • Sauna & Steam Bath
  • Modern Multi Gym
  • Coffee Shop
  • A.C Banquet Hall With Kitchen
  • Guest Rooms With Attach Toilet
  • Games Room With Chess, Carrom, Table Tennis
  • Pool Table
  • Yoga Room
  • Card Room
  • Library Room
  • Kid's Play Area
  • Fully Automatic Elevator
  • Structure : Earthquake resistant RCC framed construction.
  • Internal Walls : Cement plastering overlaid with smooth, with impervious Plaster-of-paris.
  • Doors : Imported Salwood door frame with 32 mm thick flush door
  • Windows : Openable aluminium windows with large glass panes.
  • Flooring : Laminated wooden flooring in master bedroom and vitrified tile flooring in all other Bedrooms, living/dining room and common areas.
  • Kitchen : Floor vitrified/ceramic tiles, counter tops granite with steel sink, dados ceramic tiles upto a height of 2 feet from the granite top.
  • Toilet : Floor ceramic tile flooring, dados ceramic tiles upto a height of 6 feet.
  • Sanitary ware : White, high quality porcelain fittings. Chromium-plated fittings of Jaquar or equivalent. Geyser points in all bathrooms and one washing machine point in balcony.
  • Electrical : Superior quality concealed wiring with the modular switches and miniature circuit breakers. TV socket & broadband connection. AC points in all bedrooms.
  • Telephone Wiring : Central distribution box at ground floor with a network of in-built telephone, wiring to each apartment, with provision for outer points in the living hall of the apartment.
  • Exterior : Latest weather proof non-fading exterior finish.

Base Price : Rs. 4350/sqft. ( G+12) 

SCHEDULE OF PAYMENT (For G+12 Building):

A) On Application

1,01,000/-

B) Within 30 Days of Application

30%*

C) On Ground Floor Roof Casting

10%*

D) On Third Floor Roof Casting

10%*

E) On Fifth Floor Roof Casting

10%*

F) On Seventh Floor Roof Casting

10%*

G) On Ninth Floor Roof Casting

10%*

H) On Starting of Brick Work/Plastering

10%*

I) On Starting of Flooring/Other Finishing Work

05%*

J) On or before handing over of Possession

05%*

 

SCHEDULE OF PAYMENT (For G+4 Building):

A) On Application

1,01,000/-

B) Within 30 Days of Application

30%*

C) On Ground Floor Roof Casting

10%*

D) On Third Floor Roof Casting

10%*

E) On Fifth Floor Roof Casting

10%*

F) On Seventh Floor Roof Casting

10%*

G) On Ninth Floor Roof Casting

10%*

H) On Starting of Brick Work/Plastering

10%*

I) On Starting of Flooring/Other Finishing Work

05%*

J) On or before handing over of Possession

05%*